Engineering

DB Fahrzeuginstandhaltung GmbH Neumünster

Traverser 1

Conversion, transport and start-up of a traverser from Munich-Neuaubing to the Vehicle Maintenance Works in Neumünster. Task coordination in cooperation with DB Services in Zwickau:

  • Assessment of necessary refurbishment and conversion work
  • Creation of verifiable statics for conversion measures
  • Updating of steel construction drafts
  • Adaption of SPS control to local conditions at the Neumünster works
  • Construction of full roofing
  • Planning and engineering of new ramps
  • Replacement of electric linear actuators with hydraulic drive
  • Creation of engineering drawings
  • Creation of complete documentation (instruction manual, parts lists, statics certificates, engineering drawings, wiring diagram)
  • Construction supervision
Thumbnail Image 1

VPreliminary planning in Munich

 

Thumbnail Image 1

Assembly in Neumünster

 

Thumbnail Image 1

Start-up in Neumünster

 

Traverser 2

Complete refurbishment of traverser 2. Task coordination in cooperation with DB Services Südost GmbH, Zwickau:

  • Assessment of necessary refurbishment work
  • Assessment of statics and drafting of a new beam structure
  • Mechanical construction to overhaul rail brakes
  • Preparation for driver’s cab refurbishment
  • Start-up of new controls, including programming of SPS control
  • Construction supervision
Thumbnail Image 1

Preliminary planning

 

Thumbnail Image 1

Execution

 

Thumbnail Image 1

Start-up

 

Traverser 3

Complete refurbishment of traverser 3. Task coordination in cooperation with DB Services Südost, Zwickau:

  • Assessment of necessary refurbishment work
  • Engineering of new access areas
  • Planning and engineering of new traction drive: conversion from electric to hydraulic drive
  • Overhaul of electric system, including programming of SPS control and updating of electrics documentation
  • Engineering and drafting of new stop blocks
  • Preparation for driver’s cab refurbishment
  • Planning and refurbishment of tracks
  • Construction supervision
Thumbnail Image 1

Preliminary planning

 

Thumbnail Image 1

Execution

 

Thumbnail Image 1

Start-up